| Province | Subbasin | % |
|---|---|---|
| Basinwide | - | 100.00% |
| Previous: | Next: |
|---|---|
| 84062 REL 5: 1997-024-00 EXP AVIAN PREDATION ON JUVENILE SA |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Daniel Affonso | Bonneville Power Administration | Yes | Contracting Officer | dxaffonso@bpa.gov | (503) 230-5918 |
| Joshua Ashline | Bonneville Power Administration | Yes | COR | jdashline@bpa.gov | (503) 230-3862 |
| Allen Evans | Real Time Research | Yes | Technical Contact | allen@realtimeresearch.com | (541) 719-1653 |
| Daniel Gambetta | Bonneville Power Administration | Yes | Env. Compliance Lead | dagambetta@bpa.gov | (503) 230-3493 |
| Maureen Kavanagh | Bonneville Power Administration | Yes | F&W Approver | makavanagh@bpa.gov | (503) 230-4272 |
| Rachael Orben | Oregon State University | Yes | Supervisor | rachael.orben@oregonstate.edu | (831) 212-2696 |
| Alexa Piggott | Oregon State University | Yes | Contract Manager | alexa.piggott@oregonstate.edu | (541) 740-9306 |
| JESSICA POWER | Bonneville Power Administration | No | Interested Party | jdpower@bpa.gov | (503) 230-4023 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Complete Environmental Compliance | B: 165. Obtain NEPA/ESA Clearance | 03/01/2025 | 03/01/2025 | |
| Produce accessible, error-checked datasets | C: 157. Assess the distribution and size of piscivorous waterbird colonies that may pose a threat to smolt survival in the Columbia River basin above Bonneville Dam | 01/31/2026 | ||
| Deliverable: An accessible, error-checked data set with metadata | D: 162. Determine the colony-specific and cumulative, system-wide impacts of colonial waterbirds on salmonid smolt survival in the Columbia River basin | 01/31/2026 | ||
| Produce accessible, error-checked datasets | E: 157. Collect smolt PIT tags at selected unmanaged piscivorous waterbird colonies in the Columbia River | 01/31/2026 | ||
| Produce accessible, error-checked datasets | F: 157. Assess colony size of piscivorous waterbird colonies in the Columbia River estuary | 01/31/2026 | ||
| Complete website postings and professional presentations | G: 161. Website maintenance and professional presentations | 01/31/2026 | ||
| Effective implementation management and timely contract administration | H: 119. Project coordination and administration | 01/31/2026 | ||
| Completed Annual Report | I: 132. Avian Predation Monitoring in the Lower Columbia River - 2025 Annual Report | 01/31/2026 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Wildlife |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 165 | Obtain NEPA/ESA Clearance | |||||||
| C | 157 | Assess the distribution and size of piscivorous waterbird colonies that may pose a threat to smolt survival in the Columbia River basin above Bonneville Dam | 04/04/2001 | ||||||
| D | 162 | Determine the colony-specific and cumulative, system-wide impacts of colonial waterbirds on salmonid smolt survival in the Columbia River basin | |||||||
| E | 157 | Collect smolt PIT tags at selected unmanaged piscivorous waterbird colonies in the Columbia River | 04/04/2001 | ||||||
| F | 157 | Assess colony size of piscivorous waterbird colonies in the Columbia River estuary | 04/04/2001 | ||||||
| G | 161 | Website maintenance and professional presentations | |||||||
| H | 119 | Project coordination and administration | |||||||
| I | 132 | Avian Predation Monitoring in the Lower Columbia River - 2025 Annual Report |